Past Project

S 200th St. Light Rail Extension, Kent WA

Sundancer provided two train controller units (approximately 25’ X 8’). The units supplied were originated in Kansas and Sundancer was responsible for our vendor installing all complex train control systems (working with Alstom and General Electric). Once control units were delivered, Sundancer had units craned into place, anchored units down, grounded and made final conduit connections. Sundancer also programmed and coordinated with Sound Transit engineering to integrate units into the existing train control network.

  • Owner:  Sound Transit
  • Prime Contractor:  PCL
  • Value:  $3.9m